When decorating a home, there are specific decoration techniques in each season. Winter is no exception, although there are always many inconveniences in winter, such as decoration, inconvenient transportation, dry climate, poor ventilation, and heavy dust. The troubles caused by the special season make people fear winter decoration. In fact, as long as the construction method is right, the winter can also be used for home decoration.
First, the wood products prevent deformation
Wood is more susceptible to humidity and temperature than other main materials. In order to prevent the volatilization of the wood, and then it is easy to expand and deform in the wet season, it can be solved by means of sealing the wood to ensure that the water content is maintained at a reasonable level of 5%-8%. At the same time, because the winter weather is cold and dry, and the door opening is less open, the dust in the room will be more serious. Although this will not affect the finished construction, there will be some interference to the painting work on site. The finish of the paint surface is greatly reduced. Therefore, the insiders suggest that in winter construction, the way of distributing finished products by the manufacturer should be selected as much as possible to reduce on-site construction.
Second, the woodworking work should be seamed
Leave a proper construction gap. When laying solid wood flooring, it is necessary to leave a 2 mm expansion joint around, otherwise it will cause drums and suspension; when making furniture, it is necessary to leave a joint seam of about 0.1 mm to avoid deformation.
Third, the wall and floor tiles can be laid after being warmed
Whether it is a wall tile or a floor tile, it needs to be moved from the outdoor to the interior for 24 hours, and then it can be laid when it is adapted to the indoor temperature, so as to avoid the phenomenon of emptying and falling off after construction. In addition, the bricks should be seamed in time.
Fourth, the floor tiles are moderately seamed
In the winter decoration construction, we must first pay attention to the construction of the floor and tiles when leaving a certain construction gap, in order to prevent the floor and tiles from appearing due to the expansion of the rain when the rainy season. In order to avoid leaving the gap to affect the appearance, you can leave the gap near the foot of the wall, and then take the method of laying the tile and then laying the foot plate to cover the construction gap with the foot plate.
In addition to floor tiles, cement is also a “hardest hit†that is susceptible to winter temperatures. For cement faces with a span of more than 4 square meters, a one-millimeter expansion gap should be reserved for some large units without heating. When the house is under construction, a moderate environmentally friendly antifreeze can be added to the cement to eliminate the adverse effects of temperature.
Five, putty can not be too thick
In the winter home decoration, because the indoor air is dry, the water loss is faster, the putty before the oil workers can not be too thick, otherwise it will easily cause empty drums, cracks, wall inequality.
6. Do not dismantle the heating in winter.
People who want to change the heating should not carry out home decoration in the winter. In the winter home decoration construction, attention should be paid to the protection of the original heating. If it is accidentally damaged, it will cause water seepage.
Seven, timely ventilation, fire prevention
After all, the decoration materials contain chemical components. When the concentration is low, there is no harm to the human body. However, if the air is not ventilated in time, harmful gases will accumulate in the room to a certain concentration, which will affect the health of the body. The incident of poisoning and fainting of construction workers has occurred. The debris in the room should be cleaned at any time during construction to avoid igniting the flammable materials in a dry environment. When the construction team is cooking at the host, it is necessary to prevent Mars from splashing.
Eight, indoor environmental protection attention to maintenance
Due to the frequent closure of doors and windows in winter decoration and the relationship between heating, it is easy to cause harmful substances in interior decoration to be easily discharged to the owner. In order to avoid this, on the one hand, it is necessary to fully guarantee sufficient vacant ventilation time before check-in. On the other hand, plants that can absorb harmful substances can be placed to purify the indoor air. If available, you can choose to conduct an indoor air test before check-in to ensure that the living environment is non-toxic and healthy.
9. Before entering a new home, environmental protection is the most important
After the renovation, the owner should not be anxious to enter. Experts suggest that in the case of room to ensure good ventilation, it can be moved in about one month. Because the ventilation in winter is not as good as other seasons, the indoors will retain more or less harmful gases. In addition, the newly purchased furniture should also be parked indoors for a period of time, so that the decoration materials and new furniture can be thoroughly ventilated, and the owner will come to the table.
For these problems, the decoration construction personnel must pay attention, but as the owner of the house, it is necessary to understand and grasp, in order to play a role in supervising the builders, the house is their own, who can care more than the owner himself?
Lifting Eye Bolts,Flange Allen Head Bolt,Flanged Hex Head,Bolt Hex Flange Head
Nantong Romax Hardware Co.,Ltd. , https://www.hardwarehouse.cn