The rough room is a house that has not yet been renovated. There are generally no doors and windows. In today's rising housing prices, rough housing has also been favored by many people, especially young people who are pursuing their own personalities, can decorate their own preferences. Then, we will introduce the steps for the decoration of the rough house and the precautions for the inspection of the rough house.
Blank room renovation steps
1. Check the condition of the original water inside the house and whether there is water inside the caisson pool. Observe whether there is water seepage at the corner of the house and see if there is any complaint from downstairs. If something goes wrong, you need to find it at the management office.
2, according to the design of a good foundation project, to include the need to demolish the walls, windows, stairs, etc., and then the brick building renovation project, so that the spatial pattern is more perfect and reasonable.
3. When carrying out hydropower reforms, it is necessary to regulate well. This is a hidden project. The quality of the work will affect future life.
4, Shuimugong enters the market, mainly for wall, bathroom, kitchen and other packaging. However, pay attention to the empty drum phenomenon. After the waterworks are completed, the woodworker enters the field again, and the woodworker mainly performs on-site custom private homework such as door covers, backgrounds, ceilings, and so on.
5. The painter dispatched and polished and oiled the wall. Pay attention to the relatively high environmental requirements of paint, because too much dust in the air can affect the effect and quality. The entire housing company's first installation of water heaters and Yuba, after installation, the ceiling edge can be better half-package water heater, so better and beautiful.
6, finally clean up the bathroom, in a clean environment, handling furniture. After the renovation, there will be a stimulating odor. It is better to leave it for a period of time. It is better to place it for more than 3 months. Therefore, the house needs to be cleaned.
Blank room inspection room matters needing attention
1. External finishes, including exterior inspection of balconies and rain covers.
2. Inspection of common parts, public facilities, electrical equipment and other items.
3, all kinds of pipelines through the water, pressure test, pass ball test and commissioning of heating and thermal testing.
4. The roofing project will carry out water storage and watering tests.
5, each room using prefabricated floor or cast-in-place roof inspection.
6, the room with waterproof requirements should be strictly in accordance with the waterproof layer, protective layer of the building requirements to plan, in the acceptance should be carried out two impoundment test, so that no leakage.
7. The slope of the floor drain must meet the design requirements, so as not to pour water, the joint is smooth and smooth, and there is no leakage.
The above is related to the rough room decoration steps and the rough room inspection room inspection matters related knowledge, after reading it is not more understanding of this area! Want to learn more relevant knowledge, please continue to pay attention to this site information, more exciting so stay tuned !
Blank Room Renovation Costs Blank Room Renovation Steps
Melamine Laminate,Melamine Laminated Plywood,Melamine Laminated Coated Plywood,Black Melamine Plywood
Changzhou Offistyle Furniture Co., Ltd. , https://www.offistylefurniture.com