By tightening the two blocks on the K-frame, tightening with long screws

When the equipment comes into play, send people to do a good job in the statistics of various types of accessories, and make a record. When conditions are changed during installation, the organization technicians will solve it in time. If the ladder cage has been put in place, when assembling to the outer enclosure door, it is found that the dimensional deviation cannot be assembled normally. The direct attachment type should be changed to the indirect wall. Since the plan is first, the pad is placed on the K-frame. Block blocks, tightened with long screws, etc., solved the problem in time. For the difficulties of many equipments and fewer people, we have arranged the division of labor reasonably and carried out the operation of running water. When the equipment is put into the installation, arrange the elderly and weak people to go to other rooms to carry out the elevator K-frame, the ladder cage in place, the chassis safety protection assembly, the total achievement position, the electrician power supply and so on; Wait for other personnel to install the previous one, and change it to install directly; the staff of this room will return to the previous installed equipment for debugging and finishing work, which will save the time.

During the construction process, the inspection of the installation process of the elevator is important. The following points must be made: 1) The verticality of the rail frame should be strictly controlled during the installation process. It is necessary to check whether the standard connecting bolts are locked or not. Should meet the requirements of the instructions, the flat pad should be balanced when locking, as well as the spring pad and the locking nut. The pre-tightening force of each bolt should be consistent to ensure that the bolts are balanced. There should be more than three teeth exposed when locked. 2) The standard section of the cage shall not exceed three sections. It is strictly forbidden to hang the standard section or heavy object on the small boom above the cage. During the installation process, the cage operation should be controlled at the top of the cage, and it is strictly forbidden to operate in the cage. 3) When the rail frame is installed to the height specified by the manufacturer, the wall attached device shall be installed, and the wall attached device shall be matched with the installation distance. When the hinged seat of the wall attached device is fixed by the wall bolts on the ring beam, the fastening bolts of each hinge shall not be less than 2, and the ends of the through-wall bolts shall be equipped with steel plate gaskets. Flat, elastic washers and retrofit nuts. The horizontal angle of the attachment frame installation cannot be greater than 8 degrees. After installation and commissioning, it is also necessary to send people to do the pre-test work, install communication, install safety doors, floor signs, various inspection required information, grounding devices, etc. to notify the test.

OEM By Baybio

Oem By Baybio,System For Sample Dispensing,Viral Transport Medium Kit,Disposable Virus Sample Collection Tube

Guangzhou Baybio Bio-tech Co., Ltd , https://www.gzbaybio.com