(1) The laying of the floor shall be carried out after the civil construction and renovation of the interior;
(2) The floor should be smooth, clean, dry, free from debris and dust;
(3) Cables, electrical appliances, air and other pipelines and air-conditioning systems arranged under the floor shall be completed before installation of the floor;
(4) The base of the heavy equipment shall be completed and the equipment shall be installed on the base. The height of the base shall be the same as the height of the upper surface of the floor;
(5) 220V/50HZ power supply and water source are available at the construction site.
Click Floor,Mothproof Fireproof Durable,Indoor Click Vinyl,Easy Indoor Click Vinyl
DONGYANG MAOSHENG PLASTIC CO.,LTD , https://www.maoshengflooring.com