High temperature oil pump seal leak prevention and control methods: 1, gland installation is not accurate, plugging the front cover and drain cover on the back cover. 2, the outer diameter of the seal with the seal seat aperture with loose .3, the direction of the pump Install the anti, so that the pressure port connected to the unloading ditch, the formation of pressure out of the ring .4, oil quality is not clean, the oil is not smooth .5, tubing thread with less stringent .High temperature pump seal as a high temperature pump Important parts, plays a fixed spindle, the role of sealing medium.If the leak, first check the selection and installation of the seal is accurate, and secondly check the condition is running smoothly High temperature oil pump with self-cooling structure, changing the traditional water-cooled Structure, so that the structure is simple, small size, economical operation, good performance, reliable use, is China's digestion and absorption of foreign oil pump developed on the basis of the second generation of products, the basic structure of single-stage single-suction cantilever foot support structure, Pump inlet for the axial suction, the outlet for the central vertical upward, and the same motor mounted on the base.

Solar Mounting System For Green House

The Installation of Mounting Unit
1. Make the concrete base according to solution drawing, locate embedded bolts and set out strings by Laser Level to ensure the centers of embedded bolts in the same elevation as accurate as possible on vertical, horizontal direction and at end face.
2. Locate the Anchor Plate on the concrete base and adjust the position according to solution drawing(remove M14 washer,M14 spring washer,and M14 nut if they are connected to embedded bolts now),and then fasten M14 washer, M14 spring washer, and M14 nut with the tightening torque of 60N.m.
3.Take out the Hexagon Bolt Kit with Post B Corrugated Gasket M12x95 and remove its nut, spring washer, one washer, and corrugated gasket. Insert the Post A, B, C in to Anchor Plate according to the Hexagon Bolt Kit with Corrugated Gasket M12x95 drawing and then fix them by two sets of Hexagon Bolt Kit with Corrugated Gasket M12*95. Post C Post A
4.Remove the bolt kits M12*90 from all the Posts and Pre-Assembled Supports and unfold the embedded Supports, fasten them on the Posts by bolt kits M12*90 according to the drawing.

Installation of Rails
1.Please check the length of Beam before place it onto the Pre-Assembled Supports, otherwise extend it with Splice forBeam first. There are 4 self-tapping screws in each side and total 8 self- tapping screws in both sides. We strongly recommend NOT extend the Beams on Preassembled Supports.
2.Before locate the Beams, mark the position of the Beam son the surface of Pre-Assembled Supports with maker pens according to solution drawing for easier installation. Place the Beams on the 55*80 Tube of Pre-Assembled Supports and fix it with C Clamp Kits. Install all the Beams in the same step. The tightening torque will be 20N.m. C Clamp Kit Side Beam(Please arrange 3-4 persons to install when the array is long.)

Installation of Solar Panels
1.Place the panels above the Beam 85, fixing it with Wide End Clamp Kit in the side and Inter Clamp Kit in the middle. Install all the panels in the same steps until complete installation of al panels. Fasten all the bolts with tightening torque of 10N.m.
2.Complete installation, and please inspect and make sure all the bolts are fastened.