In the entire home improvement process, hydropower design is a very important part, but many owners are easy to ignore it, and many designers are also not easy to give due attention, many designers do not understand hydropower now, strictly speaking The home improvement company must be equipped with professional hydropower designers. Unlike hydropower design and decoration design, hydropower design is first of all safe and practical, followed by decorative effects. The principle of hydropower design is that it cannot be moved without moving, and it cannot be changed easily; it can be dark and dark, and no open line is allowed. Then, Xiaobian will introduce home-installed hydropower design skills.
1, with a mirror and coat hook space, to consider the lighting near the mirror;
2. In the electrical code, it is required that the buried pipe must be made of PVC pipe and change its head.
3, the bedroom ceiling light can be considered double control (bedside and entrance);
4. According to the needs of living, the ceiling light of the living room can be considered to install sub-control switches (into the entrance hall and back to the main bedroom door);
5. Pay attention to observing whether there are modules in the telephone socket and the network cable socket;
6. There is no need to set too many sockets behind the TV. It is better to put a patch panel on the side of the TV afterwards.
7. The surround sound line should be buried when the circuit is modified.
8, pay attention to strong and weak wires can not be in the same pipeline, there will be interference;
9, if the living room, kitchen, bathroom tile, some locations can be properly considered without slotting wiring;
10, circuit transformation is necessary to consider the use of home appliances to increase line capacity;
11, the socket is generally 30CM away from the ground, should not be less than 20CM, the switch is generally 140CM away from the ground;
12. The exhaust fan switch and telephone socket should be installed near the toilet instead of the wall of the bathroom door.
13. Clear communication intentions and design ideas with workers. And on the wall bullets painted actual circuit transformation route.
14, Yuba should be considered to be installed close to the shower or bath, rather than in the center of the bathroom;
15, the balcony, corridor, cloakroom can consider reserved socket;
16, the living room, master bedroom, bathroom should be based on personal habits and convenience to consider the default telephone line;
17, a maximum of eight lines in a tube, and remember: each tube gap can not be less than 40%.
18. For large-capacity circuit equipment such as air conditioners, electric water heaters, and microwave ovens, a circuit should be provided for one device. If a circuit is used together, when they are used at the same time, the wire is prone to heat. Even if the wire does not exceed the allowable operating temperature of the wire, long-term use will reduce the insulation performance of the wire. In addition, the conductor cross-section of the large-capacity circuit should be appropriately enlarged. Increasing the cross section of the conductor can greatly reduce the loss of electric energy on the conductor.
19, how to charge the cassette must be said in advance, this is the most hidden and darkest profit point of the water circuit transformation. A cassette market is also one or two dollars, while the decoration team often charges more than ten yuan, and the general home improvement circuit design requires a small number of cassettes to be five or sixty. Therefore, it is normal for students to throw a few hundred dollars for this. Death is resisting pulling it out today. It has only one purpose. We remember five words: cut it down!
20, the location of the socket is very important, often the outlet is just behind the bedside cabinet, resulting in cabinets can not rely on the situation of the wall. It is generally not wrong to let the outlet be as close as possible, but if you leave the location of the outlet improperly, it may conflict with the placement of the furniture or the installation of the electrical appliance in the later period. Students must remember;
21, some kitchen sockets or switch with the convenience of, in order to avoid, for example, the future of rice cooker plugs to pull in and out of the inconvenience.
22, lighting, outlet circuit separate If the outlet circuit of the electrical equipment failure, only this circuit power interruption, will not affect the lighting circuit work, easy to repair the fault circuit; if the lighting circuit failure, can use the power supply socket circuit , Connect with temporary lighting.
Editor's summary: The home decoration hydropower design skills are introduced here, and I hope to help everyone. If you want to know more related information, you can pay attention to this website information.
Hydropower installation hydropower reform
Cantilever Gate Accessories ,Cantilever Sliding Gate Wheels,Guide Wheels For Sliding Gates,Cantilever Gate Metal Wheels
Jiaxing Gates Hardware Products Co.,Ltd , https://www.888gates.com